Rough, editable estimates for water, roads and project readiness. Built for county officials, institutions and private clients in Kenya.

Estimates only. These tools run entirely in your browser and nothing you type is sent anywhere. Results are rough planning figures based on the assumptions shown, which you can edit. They are not engineering designs, quotations or official standards. Confirm design figures with your county engineer, the relevant authority or a qualified professional, and ask us for a site-specific quote.
Tool 01 · Water

Borehole water-need calculator

Estimate a community’s daily water demand and the borehole yield you would need to meet it within your pumping hours. Change any litres-per-day figure to match your county’s design standard.

UsersNumberLitres / day each
People
Pupils (day school)
Cattle
Goats & sheep
Camels

Default assumptions (all editable): litres-per-day values are illustrative starting points, not official standards. Pumping hours of 8 reflect a typical solar-pumping day; use 24 for grid or generator pumping. The safety margin covers losses and growth.

Your estimate
0litres per day
Daily demand
0 m³
With safety margin
0 m³
Suggested minimum yield
0 m³/h
Equivalent 20 L jerrycans / day
0

Actual yield depends on the aquifer and is only known after a hydrogeological survey and test pumping. That is the first step of every Apex Grove borehole.

Tool 02 · Roads

Road project scoper

Work out the quantities for a road section and, if you enter your own unit rates, a first budget envelope. We don’t publish rates: use figures from your bill of quantities, a recent tender or your county engineer.

Assumptions (all editable): shoulders are surfaced with the same material; base volume = total width × length × thickness; the drainage and contingency percentages are starting values for you to set. Bridges, culverts, land and design fees are not included.

Quantities
0m² surfaced area
Total width
0 m
Base layer volume
0 m³
Surface cost
enter a rate
Base layer cost
enter a rate
Budget envelope
enter a rate
Per kilometre
–

A first-pass envelope only. Ground conditions, haul distances and drainage design can move costs significantly.

Tool 03 · Readiness

County project readiness check

Tick what is already in place for your road, bridge, borehole or supply project. Your answers stay in this browser so you can come back to them.

A general planning checklist, not a legal or regulatory requirement list. Check the requirements that apply to your project with the relevant authorities.

Readiness
0%0 of 10
Getting startedStart by writing down the need and the site.